Unfortunately it has been necessary to close the swimming pool from Friday the 4th of October 2019. The two boilers which heat the water in this building (including the pool and our shower blocks) have failed, and are, in this case, beyond repair.
Unfortunately it has been necessary to close the swimming pool from Friday the 4th of October 2019. The two boilers which heat the water in this building (including the pool and our shower blocks) have failed, and are, in this case, beyond repair.